DPM Technologies Ltd

Home / Development studies

MARKETS & DEVELOPMENT

Development studies for your market

From laboratory fixtures to energy, transport and advanced engineering: explore the work, the proposed applications and the evidence behind readiness.

Explore the engineering questions relevant to your market. Each study connects the brief, design iterations, manufacture and evidence, with separate DBOS and process indicators.

Markforged printing through partners ↗

15 development studies

No study has confirmed DBOS or process readiness yet.

Published readiness updates are checked when this page loads.

IndustryAerospaceNuclear

C14 optical inspection fixture

Preserve four mounting interfaces and the central insert while reducing resin volume.

Resin baseline · design optimisation · inspection

Generative design underway

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
Energy · onshoreMotorsportIndustryTransport

Computational heat exchanger

Develop an independent DPM thermal demonstrator from an open-source LEAP71 geometry example.

Computational design · thermal testing

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
DefenceRailIndustryTransport

Obsolete equipment replacement

Recreate an unavailable duct or cover with preserved interfaces and a repeatable manufacturing record.

Markforged fit and functional prototypes · machining

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
DefenceEnergy · onshoreEnergy · offshoreRailTransport

Modular instrument enclosure

Combine serviceable electronics packaging, interchangeable panels and a defined thermal path.

Markforged supports · metal fabrication · seals

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
NuclearEnergy · offshoreIndustry

Remote inspection probe carrier

Reach a difficult inspection location, capture a repeatable view and recover the tool in a clean mock-up.

Printed carriers · metal interfaces · assembly

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
Energy · onshoreEnergy · offshoreTransportIndustry

Condition-monitoring sensor mount

Develop a removable mount with repeatable positioning, service access and a suitable sensor interface.

Fabricated mounts · printed gauges · interface testing

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
Energy · onshoreEnergy · offshoreIndustryRail

DED shaft restoration

Compare a partner deposition and finishing route with replacing a representative worn shaft feature.

Partner DED · finish machining · material inspection

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
AerospaceDefenceTransportIndustry

CSAM housing restoration

Restore a representative aluminium housing feature while preserving adjacent interfaces.

Partner CSAM · machining · deposit assessment

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
AerospaceMotorsportRailTransportNuclearIndustrySpace

Reconfigurable assembly fixture

Adapt a controlled datum system to a revised component without replacing the entire fixture.

Fabricated frame · machined datums · printed nests

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
TransportMotorsportEnergy · onshoreIndustrySpace

Electronics cold plate

Compare temperature distribution and pressure loss around a controlled dummy heat source.

Machined or additive metal · joining · thermal test

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
Energy · onshoreEnergy · offshoreIndustryNuclear

Modular instrumented test skid

Bring fabrication, fluid components and instrumentation into a maintainable water-test assembly.

Fabrication · machining · printed locating aids

Proposed study

DBOSNot yet verifiedProcessNot yet verified
View brief & readiness
What do DBOS and process readiness mean?

DBOS readiness

Not yet verified: the workflow has not been demonstrated and reviewed for this study.

In development: the workflow is being developed or exercised.

Ready for defined workflow: requirements, revisions, operations and acceptance records have been demonstrated for the stated scope.

Process readiness

Not yet verified: the study has no verified manufacturing and inspection route.

Trials required: further material, manufacturing or test work is needed.

Ready in-house / Ready via partner: the defined route has been demonstrated and reviewed, with the delivery location identified.

Readiness applies to the stated study and scope. It is separate from project stage, equipment availability and any customer or sector approval.

Bring us your application.

We can scope the design, prototype and manufacturing evidence around your interfaces and intended use.

Discuss a development project ↗